Audit glossary

Control risk

The risk that controls fail to prevent, or detect and correct, a material error.

CISACIA

Control risk depends on how well controls are designed and how consistently they operate. Weak or untested controls mean higher control risk.

On the exam

When controls are weak, control risk rises, so the auditor lowers detection risk by doing more substantive testing.

Related terms

CISA Practise CISA questions on this and every other topic, each with all four options explained, in the CISA Question Hub, or take the free CISA diagnostic.

CIA Preparing for CIA? See the free exam guides and the study packs on the CIA page.

Test yourself with today’s question of the day.