Risk and control matrix (RCM)
A table linking each risk to the controls that address it and the planned tests.
Each row shows a risk, the related controls, whether they are key, and how each will be tested. It shows gaps (risks with no control) and redundancy (several controls over a minor risk).
On the exam
A risk with no mitigating control in the matrix is a design gap, which may be a finding without further testing.
Related terms
- Key controlsThe controls that matter most for managing a significant risk.
- Engagement work programThe documented procedures for carrying out the engagement.