Audit glossary

Risk and control matrix (RCM)

A table linking each risk to the controls that address it and the planned tests.

CIA

Each row shows a risk, the related controls, whether they are key, and how each will be tested. It shows gaps (risks with no control) and redundancy (several controls over a minor risk).

On the exam

A risk with no mitigating control in the matrix is a design gap, which may be a finding without further testing.

Related terms

CIA Preparing for CIA? See the free exam guides and the study packs on the CIA page.

Test yourself with today’s question of the day.