Changeover methods: parallel, pilot, phased and direct
Ways to switch from an old system to a new one.
Parallel running operates both systems and compares results: the lowest risk, at the highest cost. Pilot launches at one site first. Phased rolls out in stages. Direct (big bang) switches all at once: the cheapest and the riskiest.
On the exam
Lowest risk: parallel. Highest risk: direct cutover. Whatever the method, a fallback plan is essential.